How to Get an NEC4 Programme Accepted First Time (A Clause 31 Walkthrough)
The four grounds a Project Manager can use to reject an NEC4 programme, what clause 31.2 requires, and how to build one in P6 that is accepted first time.
Insights for project leaders on programme risk, NEC4, delay and project controls. Each one starts with what it means for your project and what to ask your team.
The four grounds a Project Manager can use to reject an NEC4 programme, what clause 31.2 requires, and how to build one in P6 that is accepted first time.
What a clause 32 revision must show, when you have to submit one, and the two-minute P6 step that protects your compensation event assessment.
Your programme only protects you if it is in the Contractor's Accepted Programme. What to check, and why your compensation event clock runs on your own awareness.
The CMA's procurement diagnosis is right but stops short of the moment delay is decided: when a programme nobody tested is accepted.
A main contractor rejected the programme for not matching their P6 specification. What a rebuild covers, what it cannot fix, and why the plan and the structure are two different things.
The fourteen things a UK planning specification usually demands of a subcontract programme, why each one is there, and what gets a submission rejected.
There is no direct MPP to XER conversion. The route that works, the eleven things that break on the way, and how to check the result.
Three ways to fill a planning gap, what each one costs you in risk and admin, and a short test for deciding which one your project needs.
Leeds station's entrance has slipped five times. What a new completion date does, and doesn't, prove about the programme behind it, and why a pattern of slips is what assurance exists to interrogate.
Oracle has added AI agents to Primavera Unifier. What they actually do, what they still don't check, and why the part that judges whether a plan is sound was not on the list.
A DCMA pass doesn't prove a good schedule. The 7-step checklist an independent reviewer runs in Primavera P6, with menu paths and the red flags DCMA misses.
A DCMA fail isn't a stop order. The exact P6 workflow, thresholds and version quirks for triaging a failed schedule check before you submit.
Two different jobs with different outputs. The APM's seven-element definition, the NEC angle, and a decision framework for which one your project actually needs.
Diagnose before you touch a date, rebuild the logic properly, and re-baseline with governance so it doesn't break again in eight weeks.
AI can draft a project schedule in minutes. It cannot tell you whether the logic holds, and generating a plan is not the same discipline as assuring one.
The methods (TIA, Windows, Collapsed As-Built), what FIDIC's notice clauses actually require, and why most EOT claims fail on the programme, not the law.
How the P6 leveler works, activity and project leveling priorities, and how to produce resource-feasible schedules whose dates can actually be delivered.
How Primavera P6 underpins portfolio scheduling, resource management and regulatory delivery across the water sector's £104bn AMP8 capital programme.
Possessions, interfaces and fixed CP7 funding: how P6 supports rail scheduling, PACE governance, earned value and delay analysis.
All 14 metrics and thresholds, a Primavera P6 walkthrough, and the part most guides skip: what a fail actually means for your programme.
The engagement models and the five factors that drive the fee for planning and project controls support, and how to brief for quotes you can compare.
A complete guide to understanding the role of professional project planning consultants and how they drive project success.
Which scheduling software is right for your business? Compare features, licensing and use cases for the two tools.
Learn the key indicators that your project would benefit from expert scheduling support and professional oversight.
Why hyperscale, colocation, and edge data centre projects demand Primavera P6 for multi-discipline coordination and phased commissioning.
A practical comparison of deployment, features, cost, and collaboration, plus when to use each platform or both together.
How UK architectural and design management firms can meet the scheduling demands of Saudi Vision 2030 giga-projects.
Step-by-step guide to creating baselines that withstand scrutiny, meet NEC contract requirements, and support effective project controls.
A practical guide to QSRA methodology, Monte Carlo simulation, and how Primavera P6 integrates with risk analysis workflows.
EVM fundamentals, performance indices, forecasting metrics, and practical implementation with Primavera P6 on construction projects.
A complete guide to Clause 31/32 requirements, accepted programme criteria, and how P6 supports NEC4 compliance.
From schedule health checks to full programme delivery, we help organisations get their projects back on track.
Book a Free Consultation